Keilor Basketball Stadium
Project Overview
Client: 2 Construct (for Brimbank City Council) Year Completed: 2015 Steel Tonnage: 250 tonnes Overview: Best Fab handled the full scope of fabrication, coating, delivery, and installation of the Keilor Basketball Stadium's steel frame structure, including a black epoxy coating…
Sugar Australia Factory
Project Overview
Client: Bilfinger Berger/ABI Group Pty Ltd Year Completed: 2007 Steel Tonnage: 363 tonnes Overview: Best Fab delivered the structural steel works for the new CSR Yarraville Sugar Mill, including the 33-metre-high main building, work platforms, stairs, and the bin gallery.
Bunnings Warehouse (Carrum Downs)
Project Overview
Client: ADCO Constructions Year Completed: 2015 Steel Tonnage: 450 tonnes Overview: Best Fab fabricated, delivered, and installed structural steel for the warehouses, including steel framework and cladding.
Levantine Hill Winery Building
Project Overview
Client: ABD Group Year Completed: 2019 Steel Tonnage: 200 tonnes Overview: Best Fab fabricated, supplied, and installed the steel structure for an architecturally designed winery and restaurant, with special attention to tight curved roof elements.
Melbourne Airport HIAL Gantry
Project Overview
Client: Negri Contractors Year Completed: 2016 Steel Tonnage: 120 tonnes Overview: Best Fab fabricated, supplied, and installed the High Intensity Approach Lighting (HIAL) truss for the Melbourne Airport HIAL Truss Replacement project, spanning around 150 metres.
Sydney Tulla Alliance Gantries
Project Overview
Client: Thiess (Tulla Sydney Alliance) Year Completed: 2013 Steel Tonnage: 120 tonnes Overview: Best Fab fabricated and delivered the accessible gantries equipped with VMS signs and LUMS, as well as specialised camera box gantries for the M80 Road Upgrade project.
Monash Freeway Upgrade Gantries
Project Overview
Client: Fulton Hogan Year Completed: 2018 Steel Tonnage: 700 tonnes Overview: Best Fab fabricated, coated, and delivered 15 overhead gantries for the Monash Freeway Upgrade project, with some exceeding 45 metres in length.
Geelong Bypass Noise Walls
Project Overview
Client: Fulton Hogan, Cut & Fill, ABI Group, Trade West Year Completed: 2012 Steel Tonnage: 1000 tonnes Overview: Best Fab fabricated, delivered, and installed multiple steel packages across the Geelong Bypass project, including noise walls, overhead gantries, and barrier rail…
EJ Whitten Bridge Steelworks
Project Overview
Client: Fulton Hogan Year Completed: 2018 Steel Tonnage: 800 tonnes Overview: Best Fab fabricated, coated, supplied, and installed barrier rails, public safety barriers, anti-throw screens, and handrails for the EJ Whitten Bridge Widening project, conducted over a live highway and…
M80 Ring Road Completion Noise Walls
Project Overview
Client: Acciona Year Completed: 2025 Steel Tonnage: 70 tonnes Overview: Best Fab fabricated, supplied, and installed noise wall posts and panels as part of the North-East Link Project in Melbourne, including grouting works for post anchors.
Westgate Tunnel Project
Project Overview
Client: CPBJH JV (CPB & John Holland Joint Venture) Year Completed: 2023 Steel Tonnage: 1500 tonnes Overview: Best Fab fabricated, supplied, and installed multiple steel packages: over 27 km of barrier rails, 6 km of handrails and fin balustrades, and…
Edithvale Train Station
Project Overview
Client: Acciona Infrastructure (Southern Program Alliance) Year Completed: 2021 Steel Tonnage: 320 tonnes Overview: Best Fab fabricated, supplied, and installed the train's steel structures, including canopies, buildings, concourse, main stairs, lift shafts, and platforms.
Sunshine Train Station
Project Overview
Client: Thiess Pty Ltd Year Completed: 2013 Steel Tonnage: 222 tonnes Overview: Best Fab supplied, fabricated, assembled, and installed station platform and stair canopies as part of the Regional Rail Link project.
Hawkstowe Train Station
Project Overview
Client: John Holland Year Completed: 2018 Steel Tonnage: 500 tonnes Overview: Best Fab fabricated, delivered, and installed main, east, west, and platform canopies, lift shafts, station buildings, stairs, platform structures, and rail bridge screens for the Mernda Rail Extension project.
Carnegie Train Station
Project Overview
Client: CTD Alliance (CPB/Lendlease) Year Completed: 2017 Steel Tonnage: 760 tonnes Overview: Best Fab delivered main canopies, station platforms, stairs, buildings, lift shafts, and ceilings for Murrumbeena and Carnegie Stations as part of the Caulfield to Dandenong Level Crossing Removal…
Craigieburn Bypass Bridge
Project Overview
Client: Lendlease (formerly Abigroup Contractors) Year Completed: 2004 Steel Tonnage: 300 tonnes Overview: Best Fab fabricated and delivered the steel pedestrian bridge, an 80m curved free-span architectural landmark in Melbourne, along with the curtain wall in front of the noise…
Hurstbridge Line Duplication
Project Overview
Client: Acciona (Southern Program Alliance) Year Completed: 2022 Steel Tonnage: 135 tonnes Overview: Best Fab delivered, fabricated, supplied and installed the new rail bridge spanning Plenty River, including two primary steel girders, cross beams, access stairs, walkways, and handrails. The…
Inkerman Street Rail Bridge
Project Overview
Client: Brereton Engineering Year Completed: 2009 Steel Tonnage: 80 tonnes Overview: Best Fab fabricated and supplied a steel bridge for the Inkerman Street Rail Bridge Widening project on the Sandringham rail line, spanning Inkerman Street, St. Kilda. Included two main…
Mordialloc Train Station
Project Overview
Client: Acciona (Southern Program Alliance) Year Completed: 2025 Steel Tonnage: 300 tonnes Overview: Best Fab fabricated, trial-fitted, delivered, and installed the station's steel structures, including lift shafts, station buildings, canopies, stairs, super T restraints, and other structural elements, as part…